Construction Pictures - September 16

Demolition work is mostly complete and the builders have already started to add framing in some places. Thank you for your continued prayers and support!

20200916_103156.jpg
Temporary wall being installed in basement by the elevator to allow construction on the addition to continue after Mass resumes in the church.

Temporary wall being installed in basement by the elevator to allow construction on the addition to continue after Mass resumes in the church.

Basement entrance area to the new offices.  Stairwell will be removed.

Basement entrance area to the new offices. Stairwell will be removed.

Supports in the church basement.  Construction equipment to be used in the Sanctuary required temporarily reinforcing the Sanctuary floor.

Supports in the church basement. Construction equipment to be used in the Sanctuary required temporarily reinforcing the Sanctuary floor.

20200916_103411.jpg
20200916_103219.jpg
New confessional framed in.

New confessional framed in.

20200916_105908.jpg
Area by the elevator outside the Sanctuary.  The stairwell will be removed and this will be a hallway to the new church hall.

Area by the elevator outside the Sanctuary. The stairwell will be removed and this will be a hallway to the new church hall.